You seem to be using an unsupported browser
You can continue browsing, but please use a supported browser to improve your experience.
Got it
Turn on more accessible mode
Turn off more accessible mode
Sign In
e-services
PDO Mail
PDO Staff
Flight Schedule
PDO Self-Service Password Reset
home
careers
contact
It looks like your browser does not have JavaScript enabled. Please turn on JavaScript and try again.
youtube
youtube
linkedin
instagram
facebook
Home
HSE Policy
Corporate HSE Business Plan
Golden Rules
Life Saving Rules
Page Content
2020 2nd alert HiPo#11 (Released Energy) Travelling block hit monkey board
During RIH 1” SR from ground, the Driller was on the break. A floor man, RM & 2 OHI engineers were on the rig floor. While raising the traveling block , the edge of the Traveling block hit the monkey board side walk way edge causing the traveling block to swing and the attached Sucker rod struck the helmet of the FM.
Always Ensure to check the wind speed in windy condition prior to start operation. Stop work during high winds. Always ensure to perform dynamic risk review during the operation. Always make sure Elevator bails to be avoided for sucker rod operation. Always Make sure to intervene if there seems to be an unsafe condition. Always ensure to perform proper Risk assessment prior to start job.
Category:
Second Alerts
Document Type:
Safety
Format:
.pptx
Viewers:
18
Download:
English