You seem to be using an unsupported browser
You can continue browsing, but please use a supported browser to improve your experience.
Got it
Turn on more accessible mode
Turn off more accessible mode
Sign In
e-services
PDO Mail
PDO Staff
Flight Schedule
PDO Self-Service Password Reset
home
careers
contact
It looks like your browser does not have JavaScript enabled. Please turn on JavaScript and try again.
youtube
youtube
linkedin
instagram
facebook
Home
HSE Policy
Corporate HSE Business Plan
Golden Rules
Life Saving Rules
Page Content
2020 2nd alert HiPo#09 (Released Energy) safety clamp falled and hit FM
During RIH BHA operation, floor man was preparing to make connection, slips were set, safety clamp installed and tightened. All 3 floor men were supporting to remove lifting sub with chain tong when suddenly a pin from safety clamp ejected, striking one of the floor-man helmet as a result helmet dropped down. Floor-man had mild swelling on left temporal area.
Ensure the correct size and number of segments is used for each tubular size as per OEM recommendations. As per OEM recommendation, end user to determine clamping torque. (Clamping torque necessary to prevent markings / damaging tubulars). Ensure safety clamp is visually inspected prior use.