You seem to be using an unsupported browser
You can continue browsing, but please use a supported browser to improve your experience.
Got it
Turn on more accessible mode
Turn off more accessible mode
Sign In
e-services
PDO Mail
PDO Staff
Flight Schedule
PDO Self-Service Password Reset
home
careers
contact
It looks like your browser does not have JavaScript enabled. Please turn on JavaScript and try again.
youtube
youtube
linkedin
instagram
facebook
Home
HSE Policy
Corporate HSE Business Plan
Golden Rules
Life Saving Rules
Page Content
2020 2nd alert HiPo#05 (Drops) Hoist fall down from low-bed
At around 09:00 am, Carrier was spotted on the Low-Bed truck, it was noticed that the hoist carrier is not in the center of the low bed (Right side tires were slightly on the edge of the low bed). The driver informed RM and they decided to move and bring it to the center. It started with the HGV driver going forward while adjusting the direction of the carrier, as he was going on reverse the carrier tire on the right side crossed the edge resulting in falling the whole carrier on its right side. No injuries were reported.
Always ensure effective Banks man available at all sides to giving signals to the driver. Rig manager to ensure the Carrier loading operation is done under his full supervision from its very start. All banks men shall be on a safe distance around the low bed while loading is ongoing Always ensure empowerment to stop work is been exercised. Always Ensure PTW in place is effective
Category:
Second Alerts
Document Type:
Safety
Format:
.pptx
Viewers:
19
Download:
English