You seem to be using an unsupported browser
You can continue browsing, but please use a supported browser to improve your experience.
Got it
Turn on more accessible mode
Turn off more accessible mode
Sign In
e-services
PDO Mail
PDO Staff
Flight Schedule
PDO Self-Service Password Reset
home
careers
contact
It looks like your browser does not have JavaScript enabled. Please turn on JavaScript and try again.
youtube
youtube
linkedin
instagram
facebook
Home
HSE Policy
Corporate HSE Business Plan
Golden Rules
Life Saving Rules
Page Content
2020 2nd alert HiPo#01 (Drops) safety valve joint sheared
At approximately 03:50 AM on 19th January 2020, Hoist was in process of pulling the work string after the cutting attempt. The landing joint coupling with Safety Valve snapped off and landed beside the draw-works, damaging the hydraulic valve mounting bolts of the mast raising cylinder. Zone management was followed, and nobody got injured.
Always ensure slip type elevator is used for Vam-top connections. Always ensure the presence of third-party personnel whilst their equipment are in use. Always ensure Third party personnel are attending TBT. Ensure call out specifies the correct type of equipment as per OEM recommendations. Ensure SOP is provided for all outsourced equipment. Ensure zone management is always followed (positive finding in this case).
Category:
Second Alerts
Document Type:
Safety
Format:
.pptx
Viewers:
16
Download:
English