You seem to be using an unsupported browser
You can continue browsing, but please use a supported browser to improve your experience.
Got it
Turn on more accessible mode
Turn off more accessible mode
Sign In
e-services
PDO Mail
PDO Staff
Flight Schedule
PDO Self-Service Password Reset
home
careers
contact
It looks like your browser does not have JavaScript enabled. Please turn on JavaScript and try again.
youtube
youtube
linkedin
instagram
facebook
Home
HSE Policy
Corporate HSE Business Plan
Golden Rules
Life Saving Rules
Page Content
2019 Second Alert HiPo#22 Dropped Drill pipe
During Drilling of top hole section the driller was lifting the 5“ Drill pipe (DP) by 5-ton winch from catwalk to rig floor through the V-door when the DP slipped from the end of the catwalk, hanging on the winch line and swung towards substructure & contacted the outer side of the sub base vertical support stand . No injury / equipment damaged resulted in event
Ensure that drill pipe is properly placed in the Catwalk before lifting Always be away from line of fire and maintain drop zone Always stop the work if tools or equipment are not properly placed before being lifted Always stick to the roles and responsibilities stated in the Toolbox Talk.
Category:
Safety Alerts
Document Type:
Safety
Format:
.pptx
Viewers:
16
Download:
English