You seem to be using an unsupported browser
You can continue browsing, but please use a supported browser to improve your experience.
Got it
Turn on more accessible mode
Turn off more accessible mode
Sign In
e-services
PDO Mail
PDO Staff
Flight Schedule
PDO Self-Service Password Reset
home
careers
contact
It looks like your browser does not have JavaScript enabled. Please turn on JavaScript and try again.
youtube
youtube
linkedin
instagram
facebook
Home
HSE Policy
Corporate HSE Business Plan
Golden Rules
Life Saving Rules
Page Content
2018 Second Alert - SA026_LTI26
While checking the cable reading after N/D BOP it was found to be negative. Decided to POOH the tubing hanger. While POOH, found that the cable was partially disconnected from the PFT lower connector. The cable reading was checked again after removing the PFT and it was found positive. So decided to lay down one joint and cut the cable to reconnect PFT connecter and land HGR. POOH and lay down HGR+1 joint . Started POOH the second joint and while removing the second band from the cable, it slipped very quickly into the well and during the process the cable wagged and it hit the derrickman on his left arm causing fracture.
Always suspect tension on the cable if it is found disconnected from the PFT connector. Always ensure that only competent personnel does the banding on the ESP cable. Use clamps instead on bands Use clamps instead of bands to secure ESP cable on the tubing
Category:
Safety Alerts
Document Type:
Safety
Format:
.pptx
Viewers:
21
Download:
English