Sign In
2018 Second Alert - SA042_HiPo42
While rigging down the tower light in the process of lowering down the light pole, the hoist gear got stuck. The operator called the mechanic to inspect the issue and he came and assess and could not rectify the issue therefore the mechanic went to his shop to look for barricade tape, LOTO gears in order to isolate the work area. During this time, the mechanic heard a loud bang. He then came out of the shop and noticed one employee (IP) laid down on the ground and noticed an injury on his head.
Always ensure no equipment to be left unattended during any repair/maintenance. Constantly ensure clear communication of all safety zones would not be functional during mobilization and demobilization. All the time during mobilization/demobilization it is mandatory to wear full PPE. Use JSA’s for any task Ensure work area is secure and LOTO applied before start any repair work

Category:Safety AlertsDocument Type:Safety
Format:.pptxViewers:17
Download: