You seem to be using an unsupported browser
You can continue browsing, but please use a supported browser to improve your experience.
Got it
Turn on more accessible mode
Turn off more accessible mode
Sign In
e-services
PDO Mail
PDO Staff
Flight Schedule
PDO Self-Service Password Reset
home
careers
contact
It looks like your browser does not have JavaScript enabled. Please turn on JavaScript and try again.
youtube
youtube
linkedin
instagram
facebook
Home
HSE Policy
Corporate HSE Business Plan
Golden Rules
Life Saving Rules
Page Content
2018 Second Alert - SA034_HVL05
A team (Supervisor & Technician) entered the BMF LV panel Area for continuity test with No Permit Job (NPJ). As per NPJ team has to work on conduit fixing and light fixtures. Site Supervisor and the technician opened the LV panel for checking continuity and decided to power up the lighting circuit which is not included in the NPJ. To power up the lighting circuits, the technician switched on 32A ELCB in the same panel without checking for confirmation of its respective outgoing cables. The moment he turned on the 32A ELCB the electrical flash over occurred.
Always follow Permit to Work Systems must be followed Always make sure you are competent to do the job. Always ensure to not access restricted areas without authorization. Always ensure isolation is verified prior to applying additional earthing
Category:
Safety Alerts
Document Type:
Safety
Format:
.pptx
Viewers:
10
Download:
English