You seem to be using an unsupported browser
You can continue browsing, but please use a supported browser to improve your experience.
Got it
Turn on more accessible mode
Turn off more accessible mode
Sign In
e-services
PDO Mail
PDO Staff
Flight Schedule
PDO Self-Service Password Reset
home
careers
contact
It looks like your browser does not have JavaScript enabled. Please turn on JavaScript and try again.
youtube
youtube
linkedin
instagram
facebook
Home
HSE Policy
Corporate HSE Business Plan
Golden Rules
Life Saving Rules
Page Content
2018 Second Alert - SA014_LTI14
While mast lowering preparation, a roustabout was assigned to guide the winch and install locking pin. Assistant driller was acting as banksman in order to set the winch on its base, while doing so the utility winch imbalanced and swung, which resulted in Roustabout left arm being caught between the winch and dolly beam.
Highlight any design issues or difficulties to your supervisor and management Always use two leg wire rope sling with D-link to lift the utility winches. Ensure valid PTW,TRIC and lift plan is obtained for critical tasks Stopped the job if it is not safe to do so.
Category:
Safety Alerts
Document Type:
Safety
Format:
.pptx
Viewers:
13
Download:
English