You seem to be using an unsupported browser
You can continue browsing, but please use a supported browser to improve your experience.
Got it
Turn on more accessible mode
Turn off more accessible mode
Sign In
e-services
PDO Mail
PDO Staff
Flight Schedule
PDO Self-Service Password Reset
home
careers
contact
It looks like your browser does not have JavaScript enabled. Please turn on JavaScript and try again.
youtube
youtube
linkedin
instagram
facebook
Home
HSE Policy
Corporate HSE Business Plan
Golden Rules
Life Saving Rules
Page Content
2018 Second Alert - SA021_HiPo21
While the crane operator taking back the slings after offloading the pipe at pipe rack, the slings of the crane contacted with OHL resulted in spark and OHL cut.
PH should always seek for assistance of PA/Supervisor when you are in doubt. Always ensure OHL Clearance certificate available / required while working under OHL using lifting equipment. Ensure Goal post is made while lifting activity carried out near to OHL PA should ensure Dynamic TRIC been used effectively by PH with proper control measures in place. Adequate supervision Always intervene on unsafe acts or conditions.
Category:
Safety Alerts
Document Type:
Safety
Format:
.pptx
Viewers:
15
Download:
English