You seem to be using an unsupported browser
You can continue browsing, but please use a supported browser to improve your experience.
Got it
Turn on more accessible mode
Turn off more accessible mode
Sign In
e-services
PDO Mail
PDO Staff
Flight Schedule
PDO Self-Service Password Reset
home
careers
contact
It looks like your browser does not have JavaScript enabled. Please turn on JavaScript and try again.
youtube
youtube
linkedin
instagram
facebook
Home
HSE Policy
Corporate HSE Business Plan
Golden Rules
Life Saving Rules
Page Content
2018 Second Alert - SA008_HiPo08
While laying down 4½” liner running tool (16 Meters length) using crane from V door side and elevator from the rig floor, the R/T got broken at 1.5m height, from the rotary table. One side of the broken tool (weight 300Kg), swung towards the draw works and remained suspended on the Elevator. The other broken part (Weight 55Kg), that came in contact with the rig floor, remained suspended on the crane.
Always ensure 3rd party supervision is on the drill/work floor while running or laying down any 3rd party tools Ensure effective two way communication at all times Ensure you are authorised to carry out the task Drillers should not perform any task involving third-party tools without clear instructions / confirmation of the Tool Pusher & DSV Ensure adequate work instructions / TRIC card / Lift plan, to control the work between all parties involved
Category:
Second Alerts
Document Type:
Safety
Format:
.pptx
Viewers:
15
Download:
English