You seem to be using an unsupported browser
You can continue browsing, but please use a supported browser to improve your experience.
Got it
Turn on more accessible mode
Turn off more accessible mode
Sign In
e-services
PDO Mail
PDO Staff
Flight Schedule
PDO Self-Service Password Reset
home
careers
contact
It looks like your browser does not have JavaScript enabled. Please turn on JavaScript and try again.
youtube
youtube
linkedin
instagram
facebook
Home
HSE Policy
Corporate HSE Business Plan
Golden Rules
Life Saving Rules
Page Content
2018 Second Alert - SA003_HVL03
On the 14th of February 2018 at 11:00hrs the operation was rigging up hoist floor, the Floorman was installing a section of the handrail on the Driller’s side of the hoist floor when he put the handrail on the bracket the handrail slipped from his hand and fall down to the ground from a height of 2.5 meters, a crew member was standing within 2.5 meters of the dropped handrail impact point
Always ensure no go zone are set up and communicated Always ensure your PPE is in good condition Always ensure SIMOPs are included in your TBTs Always ensure hazards are identified in your task risk assessments
Category:
Second Alerts
Document Type:
Safety
Format:
.pptx
Viewers:
18
Download:
English