You seem to be using an unsupported browser
You can continue browsing, but please use a supported browser to improve your experience.
Got it
Turn on more accessible mode
Turn off more accessible mode
Sign In
e-services
PDO Mail
PDO Staff
Flight Schedule
PDO Self-Service Password Reset
home
careers
contact
It looks like your browser does not have JavaScript enabled. Please turn on JavaScript and try again.
youtube
youtube
linkedin
instagram
facebook
Home
HSE Policy
Corporate HSE Business Plan
Golden Rules
Life Saving Rules
Page Content
2018 Second Alert - SA003_HiPo03
While the driller was working on the 18 5/8” differential stuck casing, the water bushing box end 300 kg came off from TDS (Top Drive System) crossover sub, causing the casing to drop 8 metres, striking the side door elevator, causing coupling to come off from casing.
Always ensure correct equipment (Spider Elevator) is used for the task Ensure clear communication among all supervisors and staff prior to starting critical operation. Always ensure visual inspection of threaded equipment prior to use Always ensure red zone controls are implemented
Category:
Second Alerts
Document Type:
Safety
Format:
.pptx
Viewers:
18
Download:
English