You seem to be using an unsupported browser
You can continue browsing, but please use a supported browser to improve your experience.
Got it
Turn on more accessible mode
Turn off more accessible mode
Sign In
e-services
PDO Mail
PDO Staff
Flight Schedule
PDO Self-Service Password Reset
home
careers
contact
It looks like your browser does not have JavaScript enabled. Please turn on JavaScript and try again.
youtube
youtube
linkedin
instagram
facebook
Home
HSE Policy
Corporate HSE Business Plan
Golden Rules
Life Saving Rules
Page Content
2018 Second Alert - SA039_LTI#39
Contractor requested to replace isolation valve on flow line L398 due to integrity issues with the existing isolation valve. Ignition occurred through an electrostatic discharge the resulting flash fire injured nearby Vacuum Tanker Driver Assistance.
Understanding of the executors PR-1073 requirement “Bonding/Grounding” Bonding and grounding was not mentioned as part of PTW No method statement attached in PTW due to lack of the procedure understanding. Bonding and grounding was not verified as per PR-1073, neither by contractor, nor PDO because of lack of knowledge of the consequence and updated vacuum tanker procedure (PR-2282) the system was not yet approved for use.
Category:
Second Alerts
Document Type:
Safety
Format:
.pptx
Viewers:
16
Download:
English