You seem to be using an unsupported browser
You can continue browsing, but please use a supported browser to improve your experience.
Got it
Turn on more accessible mode
Turn off more accessible mode
Sign In
e-services
PDO Mail
PDO Staff
Flight Schedule
PDO Self-Service Password Reset
home
careers
contact
It looks like your browser does not have JavaScript enabled. Please turn on JavaScript and try again.
youtube
youtube
linkedin
instagram
facebook
Home
HSE Policy
Corporate HSE Business Plan
Golden Rules
Life Saving Rules
Page Content
2017 Second Alert - SA034_LTI#29.pptx
While drilling the AD, under supervision of the TP inside the drilling console, observed an oil leak on the TDS. The TP called the CM to the rig floor to assess the problem. While the string was still rotating the TP left the Drillers console to join the CM on the rig floor to discuss the source of the leak. The DM joined the discussion. All three (3) were positioned between the TDS and the Drillers side Mast “A:” frame leg (within the Red Zone). Suddenly the pipe handler assembly with the elevator installed to the bails rotated clockwise, crushing the CM him against the Mast “A” frame leg. The DM was struck by the elevators knocking him outward of the pipe setback area. Subsequently the TP was struck by the DM and was pushed towards the Drillers console. The CM succumbed to his injuries while the DM and TP received minor injuries.
Always ensure the rotation of the drill string is stopped and isolated prior to performing any checks on the TDS Always ensure Zone Management is enforced Always ensure that all personnel are clear from the Line Of Fire Always ensure competence of staff conducting the task Always ensure hands free communication is tested and verified to ensure functionality Consequence management to be applied to all breaches of Life Saving Rules (LSR’s)
Stay away from Red /No Go Zone while equipment is in motion
Category:
Second Alerts
Document Type:
Safety
Format:
.pptx
Viewers:
19
Download:
English