You seem to be using an unsupported browser
You can continue browsing, but please use a supported browser to improve your experience.
Got it
Turn on more accessible mode
Turn off more accessible mode
Sign In
e-services
PDO Mail
PDO Staff
Flight Schedule
PDO Self-Service Password Reset
home
careers
contact
It looks like your browser does not have JavaScript enabled. Please turn on JavaScript and try again.
youtube
youtube
linkedin
instagram
facebook
Home
HSE Policy
Corporate HSE Business Plan
Golden Rules
Life Saving Rules
Page Content
2017 Second Alert - SA029_HiPo#11.pptx
Operation was planned for retrieving the wear bushing. Driller partially opened Driller side wellhead Side Outlet Valve (SOV) to drain BOP. Driller changed over from Natih line and lined up the fill up line through wellhead SOV. While making up running tool (~1.2m) and test plug at rig floor, for retrieving wear busing, the rig floor crew observed well flowing. Driller operated the Blind Shear Ram (BSR) from the Koomey unit and the well was secured. During this time a splash of water was observed from the well center, rising upto a height of approx. 5m above rotary table. As a result, the running tool and test plug assembly got caught with the split bushing and popped out to rest 1m next to well center. After performing the gas test, Assistant Driller (AD) closed the partially opened SOV.
Maintain barriers at all times Follow the procedure for adequately filling the well. Always ensure adequate supervision is established for the task. Ensure step by step written work instructions are provided for the task. Operate the equipment only with proper authorisation. Ensure the emergency process is followed.
If in doubt – stop the job
Category:
Second Alerts
Document Type:
Safety
Format:
.pptx
Viewers:
16
Download:
English