You seem to be using an unsupported browser
You can continue browsing, but please use a supported browser to improve your experience.
Got it
Turn on more accessible mode
Turn off more accessible mode
Sign In
e-services
PDO Mail
PDO Staff
Flight Schedule
PDO Self-Service Password Reset
home
careers
contact
It looks like your browser does not have JavaScript enabled. Please turn on JavaScript and try again.
youtube
youtube
linkedin
instagram
facebook
Home
HSE Policy
Corporate HSE Business Plan
Golden Rules
Life Saving Rules
Page Content
2016 Second Alert - LTI#40 LTI Nimr
The technician was painting the inspection tool rack weighing approximately 280 kg. To enable him to paint underneath the rack. The 3rd party Forklift operator tilted the rack partially with the Forklift. At this point the technician and the third party Forklift operator positioned themselves on opposite side of the rack and lowered it manually the remaining distance to the ground. During this process the tool rack landed on the Forklift operator’s left foot.
Always use mechanical handling aids when carrying out a heavy lift. Always stop to identify the hazard of the operations before starting work. Always report to the supervisor all the operational task of the day during the operational TBT. Always intervene and stop unsafe act even if your involved in the task.
Category:
Second Alerts
Document Type:
General
Format:
.pptx
Viewers:
12
Download:
English